“Robust regulation not materialising”, say residents as Cuadrilla asked again to improve water management at Lancashire fracking site

BY RUTH HAYHURST ON NOVEMBER 3, 2017


Campaigners against Cuadrilla’s shale gas operations near Blackpool have accused regulators of “repeatedly failing” to take action against company breaches.
Drone pictures from the past fortnight have shown a reoccurrence of flooding problems at the site off Preston New Road, Little Plumpton.
The problem has contributed to four breaches of the company’s environmental permit when water containing silt escaped from the pad. Campaigners have raised concerns that contamination from the pad has spread to neighbouring fields.
The Environment Agency has asked Cuadrilla several times to improve how it deals with rain water flooding but has taken no enforcement action on the issue.

In a statement to DrillOrDrop today, the Environment Agency said:
“We are aware of standing water on the well pad at the Preston New Road site following recent heavy rainfall. We have discussed this issue with the operator and we have requested further improvements to the onsite surface water management.”
The campaign group Frack Free Lancashire has expressed frustration with the regulator.
“This is not the gold-plated regulation promised us by our government. It is a tawdry imitation of the real thing and the thin covering is wearing off in front of our eyes.
“The robust regulations that the UK government have repeatedly promised residents, have not and will not ever materialise.
“The regulatory system on fracking is not fit for purpose, placing residents’ health and lives at risk by its repetitive failures to take action against company breaches and ensure that regulations live up to the tough tests they must face.”
Frack Free Lancashire urged local Conservative MP, Mark Menzies, to “step out of the shadows” and ensure that action was taken by what it called “the disjointed regulators”.
Cuadrilla made this statement to DrillOrDrop:
“The Environment Statement for Preston New Road explains the design of the well pad which has been constructed and quality checked to ensure rainwater and other site fluids are not discharged in an uncontrolled manner.
“The well pad was deliberately constructed with a protective membrane to prevent flow from site to Carr Bridge Brook and groundwater receptors. Subsequently a “bath tub” has been deliberately created which will contain rainwater safely preventing environmental harm.
“To control the quantity of rainwater on site, Cuadrilla uses tankers to remove and transport rainwater to a permitted waste water treatment facility.”
Repeated permit breachesToday’s statement from the Environment Agency coincided with a Spinwatch report which detailed five environmental permit breaches at the Preston New Road site since January, three of which are linked to surface water problems.
In February and March, permit breaches were listed against the company when water containing silt escaped from the site and discharged into a tributary of the Carr Bridge Brook (Environment Agency report).
A similar incident happened in June when silt-contaminated water escaped through an electrical conduit (Environment Agency report)
The three breaches all involved the management of surface water and were described as non-compliances, which could have a minor environmental effect. No enforcement action was taken.
In the June report, the EA instructed Cuadrilla to:
“Prevent the escape of silt contaminated surface water from the drainage system by ensuring that the drainage system is sealed”.
In a report in August, the Environment Agency told Cuadrilla:
“You should ensure sufficient surface water run-off drainage and attenuation capacity is provided at all time, to avoid water pooling on site and/or ditch overflowing.”
In that report, the EA added:
“Contingency plans should be in place to cover periods of heavy or prolonged rainfalls and any changes in normal operations.”
Details of permit breaches over surface water27 February 2017
Silt from the Preston New Road pad entered tributary of Carr Bridge Brook. The EA said a treatment method for surface water did not provide sufficient treatment to prevent silt entering the tributary. Link to Environment Agency Compliance Assessment Report
2 March 2017
Escape of surface water from the well pad containing silt into tributary of Carr Bridge Brook. The EA said silt overwhelmed a low bund and escaped into a header drain that collected surface water. Link to Environment Agency Compliance Assessment Report
14 June 2017
Cuadrilla reported during a site visit that silt contaminated water had escaped via an electrical conduit into a tributary of the Carr Bridge Brook, in breach of two conditions of the permit. Link to Environment Agency Compliance Assessment Report
The other permit breach concerned waste storage.
Drone footage has recorded standing water on at least the following dates in 2017: 15 February, 25 February, 10 March, 23 June, 9 August, 17 August, 31 August and 25 October.

Leave a Reply

How To Contact Us

welcome@frackfreelancashire.org
The Comunity Hub
Maple Farm
Preston New Road Lancashire
FY4 5RN

How to find us

Disclaimer

Important: Information on this site is presented in good faith and is as accurate as I can make it. All images are copyrighted to their respective owners. E&OE. I you have any questions please contact us using the details provided.
%d bloggers like this: